PrototypeMock-first workspace. Live access reads RLS-scoped Supabase data once the console schema is provisioned — no data is faked as live.
Clients
Demo
Team

American Electric

Commercial & institutional electrical contractor expanding into the Central Ohio data center corridor and evaluating the Cardinal Electric & Controls acquisition.

ProfileDemo
Industry
Commercial Electrical Contractor
Headquarters
Columbus, OH
Markets served
Central Ohio · Columbus metro · Data center corridor (planned)
Last updated
May 2026
Roles & hiring needs
Key roles
Commercial Electrical Project ManagerMission-critical Commissioning LeadSenior EstimatorField Superintendent
Known hiring needs
  • PM for healthcare & institutional commercial electrical
  • Commissioning capability for data center entry
  • Estimating depth (single point of failure today)
  • Two superintendent succession backfills
Workforce risks
Founder concentration (Cardinal)Very tight68% of target backlog tied to a single founder relationship.
Commissioning capabilityVery tightScarcest capability; gates all mission-critical growth.
Below-market estimating bandPressuredEstimating pay trails market; thin backup raises win-rate risk.
Superintendent retirement windowModerateTwo senior superintendents retirement-eligible within three years.
Connected dataDatabase Sync · 5 sources
Labor market — Columbus metro
intelligence.labor_market_*
Supabase
Sync 2h agoFreshness Daily42 fields
High qualityRelevance 94
BLS + regional contractor activity for Central Ohio.
Data Center Watch
intelligence.data_center_watch_*
Supabase
Sync 1d agoFreshness Weekly18 fields
Medium qualityRelevance 88
National data-center demand signal; corridor-relevant subset.
Compensation benchmarks — electrical PM
intelligence.compensation_*
Supabase
Sync 5d agoFreshness Quarterly27 fields
High qualityRelevance 91
75th-percentile total cash movement for priority roles.
Client intake & uploads
Uploaded
Freshness On upload12 fields
High qualityRelevance 97
Brief, acquisition data room, and hiring plan.
Construction permits — Central Ohio
(pending permit↔contractor bridge)
Placeholder
Freshness
UnverifiedRelevance 70
Architecture ready; permit→contractor match not yet populated.
Real-time intelligence
Data Center Watch
Supabase
Status LiveContinuous
AI and hyperscale buildout announcements in the Central Ohio corridor. Scraped and stored in the AlphaHire database — 12 active programs tracked, +3 QoQ.
Compensation movement
Demo
Status LiveQuarterly
75th-percentile total cash benchmarks for PM and feeder roles. Current read: +18% over 24 months for PM-level total cash.
Donor pool pressure
Demo
Status LivePer engagement
Qualified PM concentration across fewer than 15 donor firms in the Columbus metro. Counteroffer rate 45–55%.
Interview cycle benchmark
Demo
Status LivePer engagement
Speed-to-offer benchmarked against metro median (28–42d) and national EPC leaders (16–22d). American Electric target: 18–25 days.
Government contracts
Placeholder
Status PlannedDaily (planned)
Federal & state award momentum relevant to electrical scope.
Company & market news
Placeholder
Status Placeholder
Competitor expansion, EPC hiring, and market-entry signals.
Architecture is ready; no live external feed is connected yet. Nothing here is presented as live until a source is verified.
Uploaded client data3 files
American Electric — engagement brief.pdf
Client brief · Jan 2026 · Original commissioning brief; drove the PM market analysis.
ParsedUploaded
Cardinal Electric — acquisition data room.zip
Acquisition target · Mar 2026 · Target org chart, backlog, and key-person list.
ParsedUploaded
2026 hiring plan & role priorities.xlsx
Hiring plan · Apr 2026 · Corridor staffing ramp; pending reconciliation with the budget.
Needs reviewUploaded